Students at NC State recently engineered a system to assist weight lifters. The lifting partner was programmed to initiate new exercise sets and wait for a struggle during the tracking portion, to prevent athletes dropping heavy weights on themselves.
In 1999 Macron delivered its first large scale sorting gantry, capable of distributing totes to 1,700 individual compartments!
A heavy duty, high speed system permits a client to move a 500lbs load 4 feet in only 6.5 seconds.
Designed for vertical lift belt driven actuators, CLAWS instantaneously arrests the descent of a falling load due to loss of belt tension.